How many people to put in production per shift

Add up the hands-on minutes of all the plan's batches, add setup, cleaning and handover, and divide by one person's productive minutes in the shift. When the forecast goes up, the plan has more batches and the number changes.

Updated: 2026-11-27

The steps

  • 1. Measure how many hands-on minutes one batch of each product takes (not oven time).
  • 2. Multiply by the batches in the day's plan.
  • 3. Add the setup, cleaning and handover time.
  • 4. Productive minutes per person = shift length × the really productive share.
  • 5. People = total minutes ÷ productive minutes per person; round up if you do not want to run at the limit.
  • 6. Repeat with the plan of a busier day.

An example (invented numbers)

ProductBatchesHands-on minutes per batchMinutes in the day
Bread rolls655330
Concha470280
Assorted sweet bread550250
Croissants390270
Setup, cleaning and handover120
Total1250

With 8-hour shifts and 80% productive time, each person gives 384 minutes: 3.3 people are needed. With 15% more batches, 3.7.

What to watch

  • Breaks, meals and dough waiting times are not productive minutes for the same person: do not count them twice.
  • Each person's hours and the working-day limits are recorded in the working-time register.
  • If the result lands halfway, decide whether you cover it with overtime or with a half-shift person.
  • The numbers in the example are invented.

To go on

Frequently asked questions

How do I measure a batch's hands-on minutes?

Time a normal batch from start to finish without counting dough or oven waiting.

What share of the shift is productive?

It depends on the shop; 80% is a starting point you can adjust.

What if the result has decimals?

Decide whether you cover it with overtime or with a half-shift person.